Specific Relief Act 1963
1.[The Schedule :
[See sections 20A and 41 (ha)]
Category of projects and Infrastructure Sub-Sectors
Sr. No (1) : 1
Category (2) : Transport
Infrastructure Sub-Sectors (3) :
(a) Road and bridges
(b) Ports (including Capital Dredging)
(c) Shipyards (including a floating or land-based facility with the essential features of waterfront, turning basin, berthing and docking facility, slipways or ship lifts, and which is self-sufficient for carrying on shipbuilding/repair/breaking activities)
(d) Inland Waterways
(e) Airports
(f) Railway Track, tunnels, viaducts, bridges, terminal infrastructure including stations and adjoining commercial infrastructure
(g) Urban Public Transport (except rolling stock in case of urban road transport)
--------
Sr. No (1) : 2
Category (2) : Energy
Infrastructure Sub-Sectors (3) :
(a) Electricity Generation
(b) Electricity Transmission
(c) Electricity Distribution
(d) Oil pipelines
(e) Oil/Gas/Liquefied Natural Gas (LNG) storage facility(including strategic storage of crude oil)
(f) Gas pipelines (including city gas distribution network)
--------
Sr. No (1) : 3
Category (2) : Water and Sanitation
Infrastructure Sub-Sectors (3) :
(a) Solid Waste Management
(b) Water supply pipelines
(c) Water treatment plants
(d) Sewage collection, treatment and disposal system
(e) Irrigation (dams, channels, embankments, etc.)
(f) Storm Water Drainage System
(g) Slurry pipelines
--------
Sr. No (1) : 4
Category (2) : Communication
Infrastructure Sub-Sectors (3) :
(a) Telecommunication (Fixed network including optic fibre/wire/cable networks which provide broadband/internet)
(b) Telecommunication towers
(c) Telecommunications and Telecom Services
--------
Sr. No (1) : 5
Category (2) : Social and Commercial Infrastructure
Infrastructure Sub-Sectors (3) :
(a) Education Institutions (capital stock)
(b) Sports infrastructure (including provision of Sports Stadia and Infrastructure for Academies for Training/Research in Sports and Sportsrelating activities)
(c) Hospitals (capital stock including Medical Colleges, Para Medical Training Institutes and Diagnostic Centres)
(d) Tourism infrastructure viz.
(i) three-star or higher category classified hotels located outside cities with population of more than one million;
(ii) ropeways and cable cars
(e) Common infrastructure for industrial parks and other parks with industrial activity such as food parks, textile parks, Special Economic Zones, tourism facilities and agriculture markets
(f) Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage
(g) Terminal markets
(h) Soil-testing laboratories
(i) Cold chain (including cold room facility for farm level pre-cooling, for preservation or storage of agriculture and allied produce, marine products and meat)
(j) Affordable Housing (including a housing project using at least 50% of the Floor Area Ratio (FAR)/Floor Space Index (FSI) for dwelling units with carpet area of not more than 60 square meters
Explanation :
For the purposes of this sub-clause, the term “carpet area” shall have the same meaning as assigned to it in clause (k) of section 2 of the Real Estate (Regulation and Development) Act, 2016 (16 of 2016).]
--------
1. Ins. by Act 18 of 2018, s. 14 (w.e.f. 1-10-2018).
#SpecificReliefAct1963 #SpecificReliefAct1963schedule #ScheduleSpecificReliefAct1963
INSTALL Android APP
*Note : All content on this website is for only educational purpose do not use it any where as legel activities and Publisher or owener is not responsible for any mistake if any mistake please suggest us. we will try to improve that.